ADR-064 — A project's deadline: claims, leases and per-repository markers

Status

Accepted (2026-10-02; the per-repository deadline, the best-effort commit, the archive rule and the reopen's un-archiving settled by the product owner in conversation, the claims and leases by the orchestrator of the merge). Implemented by merge task M3-05a: apps/api/src/modules/project/deadline.ts (the rules, the reopen, a repository's own deadline, the staff's lock) and modules/project/jobs.ts (the ticker's claims, the project.deadline job); migration 0059_project_deadline. Tested by modules/project/deadline.db.test.ts. Completes ADR-006 (as its merge addendum carries it to projects), ADR-012 and D13 (amended the same day, docs/merge/08-decisions.md).

Context

heig-classroom applied a deadline with a deadline.apply job per due assignment, sent by its ticker as a pg-boss singleton, which re-read locked_at and bot_commits per repository. In Quiz a singletonKey without singletonSeconds dedupes nothing on a standard queue, and the in-process queue of development did not dedupe the same way (#273): a dedupe that holds in one of the two is worse than none. Quiz's ticker also runs every second for the live evaluations; nothing in a tick may wait for GitHub (invariant 5).

Three more facts shape the port. A deadline is no longer the project's alone: the staff may give one repository its own (D13 amended). A job may crash, or exhaust its retries, halfway through a hundred repositories, and must be resumable without doing anything twice (N-RES-08). And a deadline may move while its job runs: a reopen, an extension, a staff's unlock must win over a pass already under way.

Decision

  1. Everything is per repository, on its effective deadline (coalesce(project_repos.deadline_at, projects.deadline_at), and effectiveDeadline of @quiz/domain): deadline_applied_at (the provisional freeze written, audited project_repo.deadline_applied), frozen_at (definitive at the effective deadline + the grace, audited project_repo.frozen), deadline_committed_at (strategy commit). The project keeps only its own deadline_applied_at, for its state (locked at its deadline); its frozen_at is dropped (migration 0059), the freeze being a repository's. A repository takes deadline work when it is provisioned, not deleted, and its project is not archived (LIVE and its twin isLive; #476).
  2. The ticker claims, the job acts. The task project.deadlines (every 20 s) runs conditional writes on the server's clock: publish the scheduled drafts (through publishProject, whose refusals keep an incomplete group project a draft), lock the projects due, write each repository's provisional and definitive freeze — all database-only, so they happen in the tick itself — and, with a queue only, take the lease of each project with GitHub work left and send its job. Without a queue the tick claims nothing: a job never runs in the ticker's process; a staff action then runs it in its request.
  3. A lease, not a singleton. projects.deadline_job_at is taken by one UPDATE … WHERE deadline_job_at IS NULL OR deadline_job_at < now − 10 min … RETURNING, and the job carries it: a job whose lease is no longer the row's does nothing. The job renews it after each repository it settles (UPDATE … WHERE deadline_job_at = <held>), so a slow job is never taken over while it works, and stops as soon as a renewal finds the row holding another lease. It gives the lease back when every repository is settled. A failure backdates it (still conditional on holding it) to now − 10 min + 30 s, so the next tick claims the work again some 30 s on — inside N-PERF-07's five minutes; a crash keeps it until it expires, ten minutes after its last renewal. The queue does not retry the job (a retry would carry a stale lease). A staff action (a reopen, an extension, a lock) asks for the same lease; when a job holds it, the next claim does the work.
  4. Desired state against recorded fact. What GitHub should hold is the staff's hand (staff_lock, true or false) or else the deadline's lock (deadline_applied_at set, strategy lock) — deadlineWantsLock of @quiz/domain, WANTS_LOCK its SQL twin for the scans; what it holds is locked_at (and archived_at), written after each call as the fact it is, never conditioned on the desire. Work is any difference, or a deadline commit due. The job re-reads a repository's row before each step, so a reopen or an unlock landing while GitHub was locking is simply the next step: the lock just made is lifted.
  5. Recorded before the move. A deadline commit is written to bot_commits(deadline) before its ref moves, like the restore's (ADR-062 addendum); a branch whose head already is the deadline's commit gets none again.
  6. A 404 is terminal (markRepoDeleted, via: deadline). The archive stands for the lock only where rulesets cannot exist — a repository provisioned without its protection ruleset, or GitHub refusing one for the plan — never on a 5xx or a rate limit; it is audited once per repository (project_repo.archived) and counted as a lock in the job's project.deadline_enforced.
  7. Moving a deadline requalifies the runs of the repositories it moves (receivedLate, the ingestion's rule) and reselects the score of those whose runs flipped or that reopened (reopens of @quiz/domain: applied and now ahead) — their markers, their frozen and review slots, their deadline dispatches and the staff's hand cleared — in the moving transaction; the locks are lifted by the next job, never a hundred GitHub calls inside the request. A run being ingested reads both deadlines under a share lock, so a deadline moving at the same time either comes first or requalifies it.

Consequences

  • No queue policy is relied upon: pg-boss and the in-process queue behave alike, and two jobs never settle one project at once.
  • A crashed pass resumes on its own within ten minutes and repeats nothing.
  • The staff's unlock after the deadline is never undone by a resumed pass, until the repository's deadline moves (F-PROJ-09).
  • The tick stays database-only, with or without a queue; a test asserts that it makes no request.
  • Without a queue (JOBS_DISABLED=1), GitHub follows a deadline only when a staff action asks for the work.

Rejected alternatives

  1. One job per repository (heig-classroom's ADR-006 point 2): a hundred jobs per deadline for one lease each, and no single place to bound the concurrency GitHub's secondary limits ask for.
  2. Conditional marks only (record locked_at only if the lock is still wanted): a reopen between the call and the mark leaves GitHub locked and the row saying otherwise, which nothing would ever repair.
  3. The reopen unlocking inside the PATCH (heig-classroom): a hundred calls in a request, and a failed unlock swallowed.
  4. A lease without renewal: a job longer than the lease would be overlapped by a second one.

Addendum (2026-10-02, merge task M3-05b): the review dispatches

The final review and the review checkpoints take the same shape, decided by the product owner (points 2 to 5) and the orchestrator (points 1, 6 and the review round's tightening of 2, 4 and 6):

  1. A lease of their own, one frame. projects.dispatch_job_at (migration 0060), taken, renewed, backdated and given back exactly as deadline_job_at; both jobs run in ONE frame, runLeased of modules/project/lease.ts (the lease compared, the installation's client, the repositories four at a time with a renewal after each, a lost lease → stop, a failure → backdated lease and throw, else released). The ticker claims the dispatch lease, WITH A QUEUE ONLY, for each project with a final review or a checkpoint due, and sends one project.dispatch job (retryLimit: 0); nothing in a tick calls GitHub, and without a queue no review is ever dispatched.
  2. At most once. Each repository's dispatch is claimed in the grade_dispatches ledger (ON CONFLICT DO NOTHING, the sha it sends recorded) in a transaction that re-reads the repository under its row lock — a reopen landing meanwhile wins, and forgets the repository's deadline rows. A ledger row is NEVER sent again: one left without dispatched_at — a crash between the claim and the call, a request that got no response, or a 5xx, which GitHub may have acted on — is "not confirmed" for the staff (M3-08). Only a 4xx gives the claim back for the next pass (the lease backdated); a 404 marks the repository deleted. Octokit's retries are turned off for this one call. heig-classroom retried an unconfirmed row (at least once): a review costs the organization an LLM call and may overwrite the slot, so a duplicate is worse than a missing one, which the staff see.
  3. Per repository, at its definitive freeze, at the frozen run's commit with the repository's EFFECTIVE deadline in the payload; never for a project graded none, a repository without a frozen run, one archived as its lock (H8; never un-archived for a review) nor one whose protection is suspended (F-PROJ-08; its teacher's score settles it) — both audited project_repo.review_skipped with their reason, by the ticker at the freeze or by the deadline job archiving a repository already frozen. projects.review_dispatched_at is dropped: the ledger says it.
  4. Only Quiz's final review counts: the review slot takes a review run only when its triggering_actor is Quiz's App (none: a person's, failing closed), it is not to_verify, and it STARTED (run_started_at) at or after the repository's frozen_at and after its deadline ledger row was claimed — so neither a checkpoint's run nor one from before a reopen, delivered late, is taken for it. The workflow_run event does not carry the dispatch's client_payload: a checkpoint's run started after the final review was asked would still pass. (5) leaves that only to a GitHub delay longer than the gap from the checkpoint to the deadline, plus the grace, plus one tick — an Actions incident, not a student's doing. The slot also compares GitHub's clock (run_started_at) with ours (frozen_at, the ledger's created_at): a clock of ours running ahead of GitHub's by more than the dispatch's round trip would leave a real final review as a trace (negligible under NTP, visible as "no review" to the staff). The rules of this point and of the at-most-once 5xx case were decided by the orchestrator during the review of M3-05b (2026-10-02), within the product owner's choices: only Quiz's review counts, never twice, and a review on a tampered workflow (protection suspended) counts for nothing.
  5. Checkpoints fire at their date while they lie before the project's deadline (else void: never, but deletable; checkpointFires and checkpointRefusal of @quiz/domain, their SQL twin only in the claim), to every live repository whose effective deadline has not come (CHECKPOINT_TARGET), on the last receipt before the date that no bot pushed; a checkpoint is marked dispatched once a pass met no refusal. A repository already at its deadline (even in its grace) gets none. Deleting one is refused once any ledger row names it; the deletion and the claim are ordered by the checkpoint's row lock.